Critical Info Blog

Don't miss any important event

Industrial

Best rated clean room sandwich panel manufacturer and supplier

Premium gmp clean room panels manufacturer and supplier: In order to ensure the cleanliness of the air necessary in the clean room, to reduce or prevent indoor dust production and growth of microorganisms, reduce or prevent the introduction of particles, microorganisms or materials that may cause cross-contamination into the clean room, Pharma clean room facility effectively removing indoor particles / microorganisms discharge. In order to achieve the ideal purification effect and reduce the purification cost, local air purification equipment is often used, including pass box, clean bench, fume hood, weighing booth,laminar flow hood,etc. Discover additional details on gmp clean room panels.

Tablet press dies wholesale manufacturer and supplier 2024: Obstacles such as work desks in the clean room will have eddy currents at the junctions, and the cleanliness will be relatively poor near them. Drilling air return holes on the work desks will minimize eddy currents; assembly Whether the selection of materials is appropriate and whether the equipment layout is perfect are also important factors for whether the airflow becomes a vortex phenomenon. The above introduction is related to clean room and airflow influencing factors.

A clean room refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, airflow speed and airflow distribution, noise vibration and lighting, Static control is within a certain demand range, and a specially designed room is given. That is to say, no matter how the external air conditions change, the interior can maintain the characteristics of cleanliness, temperature, humidity and pressure that were originally set. The main function of the clean room is to control the cleanliness and temperature and humidity of the atmosphere that the product comes into contact with, so that the product can be produced and manufactured in a good environmental space. We call such a space a clean room.

The above introduction is related to the introduction of clean room and testing purpose.If you have different opinions or suggestions, you can always contact us.As long as you want the clean room project, Suzhou Pharma Machinery Co., Ltd. will realize it for you.Choose a reliable engineering company, Suzhou Pharma Machinery Co., Ltd., will be responsible for your project to the end, and the reputation is guaranteed.Our company has completed 500+ clean room projects all over the world. Many new and old customers like to buy the products they want in our company. The price is reasonable, the integrity is guaranteed, and the after-sales service is good.If you have related (clean room) projects recently, you can contact us at any time. See extra information at https://www.sz-pharma.com/.

Regular replacement of new UV lamps, replacement of the purification system of the initial effect, medium effect, high efficiency head: regular (at least once a year) replacement of new UV lamps to ensure that UV lamp sterilization continues to be effective. At least once every 2 years, or according to the cleanliness to verify the actual situation, regularly replace the initial effect, medium effect, high efficiency head. To ensure that the function of the purification system continues to be effective, and at the same time, make a replacement record in the use of the log, and regularly archive and save. During use, the movement or activity of personnel should be reduced as much as possible.

Labeller is a device that pastes rolled self-adhesive paper labels (paper or metal foil) onto PCB, products or specified packaging. It has a wide range of applications, and can meet the full circle labeling or semi circle labeling of round bottles. The labeling switching between bottles is simple and easy to adjust. Blister packaging machine is a machine that uses transparent plastic film or sheet to form a blister and seals the product between the blister and the bottom plate by means of heat sealing and bonding. Application: capsule, plain tablet, sugar coating, capsule, injection, abnormity, etc., as well as sealed packaging of medical devices, light food, electronic components blister.

Use a Hygrometer: A hygrometer is a device that measures the current humidity level in the room. By regularly monitoring the cleanroom humidity control with a hygrometer, you can identify any fluctuations and take corrective action if necessary. Ventilation: Proper ventilation is crucial for maintaining healthy humidity levels in clean rooms. Ensure that there are sufficient exhaust fans in place to remove excess moisture and carbon dioxide from the air. Additionally, consider installing temperature and humidity sensors to monitor changes in the environment and adjust ventilation accordingly. Control Water Sources: Closely monitor water sources within the clean room, such as sinks or taps, as they can contribute to high humidity levels. Be sure to turn off faucets when not in use and avoid running water unnecessarily.

Mainly control the pollution of air dust particles and organisms (bacteria) to working objects, and maintain a negative pressure with the atmosphere inside. Pharma cleanroom project It is suitable for precision machinery industry, electronics industry, aerospace industry, high-purity chemical industry, atomic energy industry, optomagnetic product industry, LCD, computer hard disk; pharmaceutical industry, hospital, operating room, sterile ward, food, cosmetics, beverage products Animal laboratory, physical and chemical laboratory, blood station, etc. More cases check our cleanroom project page.

The detection of air volume and wind speed must be carried out first, and all effects of purified air conditioning must be obtained under the designed air volume and wind speed. Before air volume detection, it is necessary to check whether the fan operates normally, whether all components in the system are installed correctly and whether there are obstacles (such as whether the filter is blocked or blocked). All valves should be fixed at a certain opening position, and the size of the measured air outlet and air duct must be measured. For the turbulent flow clean room, the air supply volume shall be determined by the air outlet method or air duct method. See Item 6, 7 and 8 respectively. For the air outlet without filter, the method in Appendix I of the current national standard code for construction and acceptance of ventilation and air conditioning engineering (gbj243) can be implemented.